A shared septic system or on-site sewage facility is critical community infrastructure. The board should know what the association owns, which parcels and buildings it serves, which public authority regulates it, who is qualified to inspect and maintain it, and how an alarm or failure will be handled before sewage service is disrupted.
This checklist focuses on association-owned or association-operated OSSFs in Burnet County. It does not assume that every individual lot system is an association responsibility. Start with the recorded declaration, plats, easements, deeds, maintenance agreements, utility documents, permits, and property records. An HOA rule or management practice cannot transfer a public permit or private maintenance duty by itself.
Confirm jurisdiction first. A Burnet County mailing address can be inside a city, an extraterritorial area, a river authority jurisdiction, or another permitting arrangement. Burnet County's current OSSF page links an LCRA jurisdiction map and directs applicants through County Development Services. Record the parcel, service area, permitting authority, water provider, floodplain context, and written confirmation when jurisdiction is uncertain.
Build a facility identity sheet. Record the permit and authorization numbers, installation date, approved design, system type, rated capacity, service connections, tanks, treatment units, pumps, controls, alarms, disinfection, disposal area, spray or drip zones, access ports, electrical service, monitoring equipment, shutoffs, easements, and responsible property owner. Use approved plans and field verification rather than a former director's memory.
Map every served connection. List each home, condominium unit, clubhouse, pool facility, office, guardhouse, restroom, maintenance building, or other discharge connected to the system. Compare the current use and occupancy with the permitted design. Changes in use, added fixtures, expansions, conversions, or new connections should be reviewed with the permitting authority and qualified professionals before work begins.
Keep permits and private approvals separate. Burnet County's current page says building and OSSF permits are required in the County process and that an application can require a site evaluation, design or drawing, filed affidavits, and maintenance contracts depending on the system. A board architectural approval does not replace that public process, and a public permit does not decide association ownership or cost allocation.
Do not rely on a fee quoted in an old board packet. Burnet County publishes current application steps and fees, but fees, forms, addresses, review procedures, and supporting documents can change. Use the live County page and obtain written confirmation for the actual project. Budget permit, design, inspection, engineering, legal, recording, contractor, and restoration costs separately.
Preserve the approved design. Keep the site evaluation, soil or site information, construction authorization, approved plans, installer record, inspection reports, authorization to operate, affidavits, maintenance contract, as-built drawing, equipment manuals, warranties, photographs, and later repair approvals in one controlled system record. Mark draft or superseded plans clearly.
Use licensed or registered professionals for regulated work. TCEQ currently states that OSSF installers, maintenance providers, maintenance technicians, site evaluators, and designated representatives have defined licensing or registration requirements. Verify the individual and applicable credential through current official sources; a company logo or prior invoice is not proof of current authority.
Review the actual maintenance requirement for the system and local order. TCEQ explains that certain systems can require a maintenance contract and identifies minimum provider duties, while also warning that local permitting authorities can adopt more stringent requirements. Obtain the permit, local order, contract, and written direction that apply to this facility instead of copying a schedule from another community.
Write a maintenance scope that can be audited. Identify required visits, component inspections, testing, disinfection, alarm checks, pump and control review, effluent observations, disposal-zone inspection, report content, report recipients, complaint response time, after-hours contact, parts and labor, exclusions, renewal, termination, and records handoff. Name the licensed maintenance provider and any registered technician performing the work as required by the applicable rules and contract.
Collect the provider's reports. TCEQ's current maintenance guidance describes reports to the owner and permitting authority and identifies minimum site-visit and testing duties for covered systems. Track visit date, technician, credential, components checked, readings, pass or fail result, complaint or monitor notice, deficiency, repair recommendation, report submission, and closure. A paid invoice without the technical report does not prove the system passed.
Create an alarm response card. For every audible, visual, text, radio, or phone alert, record what the alarm means, who receives it, backup recipients, immediate resident direction, safe actions, actions volunteers must not take, maintenance provider, wastewater contractor, electrician, permitting authority, public-health contact, manager, board escalation, insurer, and emergency spending authority.
Do not silence an alarm and call the event closed. Record the time, system status, affected component, observed conditions, temporary protection, dispatch, diagnosis, repair, test, disposal-area impact, resident communication, regulatory report if required, and return to normal operation. Protect credentials and technical controls from untrained access.
Plan for power loss. Pumps, aeration, alarms, disinfection, telemetry, controls, and disposal can depend on electricity. Identify normal and backup power, transfer equipment, fuel or battery limitations, safe shutdown, generator connection, electrician, maintenance provider, maximum operating assumptions, resident conservation message, and restoration checks. Do not connect improvised power or bypass safety controls.
Protect the disposal area. Mark spray fields, drip fields, drainfields, tanks, access lids, lines, easements, setbacks, and inspection routes on the property map. Control vehicles, construction staging, storage, landscaping, tree roots, irrigation, grading, fences, decks, pools, drainage work, and resident activity that could damage or obstruct the system. Put no-storage and access requirements in vendor scopes.
Coordinate water and wastewater operations. A large leak, pool discharge, irrigation error, or unusual inflow can create a wastewater problem. Track water use and known events against OSSF capacity and alarms. Use qualified professionals before redirecting roof, stormwater, groundwater, pool water, or other flows; an OSSF is not a general drainage system.
Control chemicals and disinfection through the approved design. TCEQ's current homeowner guidance warns that wastewater disinfection uses products suitable for that purpose. Do not substitute swimming-pool tablets or household products because they are available in the maintenance room. Follow the permit, manufacturer, maintenance provider, and regulator instructions for the actual system.
Create a resident-use guide from professional instructions. Explain what may enter the system, items that can clog or damage it, water-use practices during an alarm or outage, reporting channels, access restrictions, and emergency communication. Avoid presenting a general flyer as a technical guarantee or using owner education to shift an association maintenance duty without authority.
Use a documented complaint process. TCEQ directs complaints about a malfunctioning OSSF to the local permitting authority and describes escalation when a local authority does not resolve a complaint. The association should investigate its own system promptly, preserve facts, dispatch qualified help, and communicate without retaliating against the reporter or promising a regulatory result.
Separate public enforcement from private enforcement. The County or other authorized agent administers its permit and enforcement authority. The association administers valid governing documents through its own process. Do not invent a County fine, threaten a permit action the board cannot take, or label an owner responsible before verifying the connection, facts, and documents.
Maintain an incident log. Include backups, overflows, odors, surfacing effluent, alarm events, pump failures, damaged spray heads, frozen or broken lines, unauthorized access, electrical faults, complaints, service interruptions, environmental conditions, photographs, sampling or test results, response, notices, repairs, costs, and closure. Protect private health and resident information from open packets.
Budget by component and risk. Track routine maintenance, testing, disinfection, pumping, parts, telemetry, electrical work, emergency response, regulatory work, design, major repair, replacement, restoration, and reserves. Use the approved system capacity, condition, failure history, professional recommendations, inflation, and replacement planning. Do not treat a maintenance contract as proof that no capital expense is coming.
Tie major work to procurement controls. Give bidders the same approved plans, known conditions, regulatory path, access, safety requirements, resident coordination, restoration standard, report format, testing, warranties, closeout, and assumptions. Confirm credentials, insurance, subcontractors, exclusions, change-order authority, and responsibility for permit communication before work begins.
Connect OSSF work to board records and meetings. The board packet can show permit status, current maintenance contract, required visits completed, open deficiencies, alarms, complaints, projects, spending, reserve implications, and decisions. Keep security details, personal information, access codes, privileged advice, and unverified allegations out of the public-facing packet.
Prepare for a manager or board transition. Transfer permits, plans, as-builts, easements, affidavits, authority contacts, provider contracts and credentials, reports, testing history, alarms, telemetry accounts, keys, access rules, component inventory, incident log, open repairs, budgets, reserve information, resident templates, and renewal calendar. Test that the successor can locate an alarm, reach the provider, and retrieve the current authorization before removing old access.
Review the file after every project, failure, ownership change, system expansion, provider change, and regulatory update. TCEQ has continued rulemaking work concerning OSSF requirements, so an old checklist should not be treated as permanent law. Use the current Burnet County and TCEQ sources for each material decision.
This article is general association-management education, not legal, environmental, engineering, wastewater, public-health, insurance, reserve-study, accounting, or property-specific advice. Permit authority, maintenance requirements, professional duties, governing documents, system design, and site conditions vary. Verify current official sources and use qualified Texas professionals for the actual community.