A Lake LBJ dock or marina is an association asset, waterfront access point, regulated structure, vendor workplace, insurance exposure, and resident amenity at the same time. The association controls its private property, governing documents, contracts, budgets, access rules, and records. The Lower Colorado River Authority and City of Horseshoe Bay control their own permits, safety standards, water-quality programs, and enforcement. The operating workflow must keep those authorities distinct.
Start with jurisdiction, ownership, and responsibility. Confirm the parcel, shoreline boundary, submerged or adjacent property interests, easements, common and limited common elements, owner-maintained slips, shared facilities, City jurisdiction, LCRA lake jurisdiction, utility facilities, and any developer or neighboring-association rights. Use plats, surveys, declarations, deeds, leases, permits, approved plans, and title or counsel review rather than visual assumptions.
Build an association-owned waterfront asset register. Assign a stable identifier to each dock, marina segment, slip, gangway, ramp, walkway, piling, anchor, cable, flotation unit, roof, electrical panel, receptacle, light, water line, fire device, lifesaving device, ladder, gate, camera, storage area, fueling or pump-out equipment if any, shoreline structure, buoy, and access route. Record ownership, approved plan, dimensions, capacity, installation date, permit, vendor, inspection cycle, condition, warranty, last work, and next action.
Classify the facility under current LCRA rules before scheduling work. LCRA's current public guidance states that residential docks on the Highland Lakes must meet its Safety Standards for Residential Docks and identifies flotation, lighting, access, anchoring, and maximum-distance requirements. It also states that LCRA does not require a permit, registration, or fee for a residential dock occupying 1,500 square feet or less. Confirm the current definition, measurement method, plans, and actual use instead of labeling an association facility residential from its appearance.
Treat marina and larger-facility review as a separate track. LCRA currently states that all marinas on the Highland Lakes must comply with the Highland Lakes Marina Ordinance and have an LCRA permit, and that the ordinance also applies to floating docks occupying more than 1,500 square feet of water surface area. Its marina page describes an updated ordinance effective May 24, 2023 whose changes included annual marina fees phased in over two years, a two-year deadline for marinas to replace unencapsulated foam or enter a replacement agreement with LCRA, and a ban on new community marinas. Verify the live ordinance, permit status, deadlines, fees, inspection history, and facility classification with LCRA for the actual association.
Create a permit and approval register. For every structure and material alteration, record the facility ID, work description, authority reviewed, application, plans, engineer or other professional, submission date, fee, reviewer comments, permit number, conditions, inspections, expiration, closeout, and records location. Keep the current LCRA ordinance, residential dock standards, and City permit links with a review date rather than copying a summary into a permanent private standard.
Coordinate City building permits separately. The City of Horseshoe Bay's current permit page says a permit is needed for work adding, altering, repairing, removing, modifying, or replacing specified systems or structural and accessory improvements, including a boat house. A private association approval or LCRA permit does not replace a City permit, and a City permit does not decide common-element authority, owner responsibility, or contract approval.
Recover the approved plan set before changing the structure. Preserve the site plan, dimensions, elevations, structural details, anchoring, flotation, electrical design, lighting, fire protection, accessibility information, utility layout, slip plan, shoreline work, permit conditions, inspection reports, and later approved revisions. If the built facility differs from the records, document the condition and obtain qualified and regulatory direction before assuming an alteration is grandfathered or acceptable.
Establish a qualified inspection program. Define separate reviews for structural condition, flotation, anchoring, electrical systems, fire and life safety, access, utilities, roofs, railings, ladders, gates, security, shoreline interfaces, and underwater components. A manager's visual walk-through can identify obvious issues, but it is not an engineer's, electrician's, fire professional's, diver's, or regulator's inspection.
Use a property-specific inspection calendar. Include routine walks, qualified periodic reviews, pre-season readiness, post-storm and high-wind checks, water-level changes, collision or impact events, electrical trips, movement or listing, loose components, unusual sounds, damaged flotation, submerged hazards, algae events, and reported shocks or tingling. Record who inspected, scope, conditions, photographs, measurements, urgency, interim protection, and required follow-up.
Control flotation and anchoring as asset systems. LCRA's public dock materials identify encapsulated flotation and anchoring standards among residential-dock safety topics. Maintain manufacturer and installation records for flotation, anchors, cables, pilings, deadmen, connections, and load assumptions. Do not send unqualified workers under or onto an unstable structure or improvise repairs from photographs.
Treat dock electrical work as specialized and urgent. Maintain panels, breakers, grounding and bonding records, receptacles, shore-power equipment, lighting, conduit, disconnects, inspection history, and qualified electrician contacts. For a shock, tingling sensation, damaged conductor, submerged electrical component, fire, or unexplained trip, keep people out of the water and area, use 911 and utility or public-safety direction as appropriate, isolate power only when safe and authorized, and obtain qualified inspection before reopening.
Write a controlled access and slip-assignment procedure. Identify authorized users, keys or credentials, vessel and trailer information, insurance or registration requirements adopted by the association, guest access, contractor access, loading, storage, prohibited uses, transfer or leasing rules, waitlists, accessibility requests, enforcement, emergency entry, and termination. Apply governing documents and approved policy consistently and protect personal and security information.
Separate association rules from navigation and public authority. Define the board's private operational expectations for speed near the facility, wake, loading, storage, swimming, fishing, noise, pets, fires, grills, fuel, repairs, and contractor work. Do not represent an association sign or rule as an LCRA, City, county, state, or law-enforcement order unless the relevant authority adopted it.
Coordinate buoys through the current LCRA process. LCRA's public guidance says a no-wake buoy may be placed up to 50 feet beyond a shoreline or dock under its Lakewide Authorization when conditions are met, while other restricted-area requests may require a permit. Record the purpose, location, survey or measurements, current authorization reviewed, application if any, installation, maintenance, and responsible party. Do not place a regulatory-looking buoy based only on a board vote.
Route dredging, fill, shoreline alteration, and vegetation work separately. LCRA maintains a Dredge and Fill Ordinance and permit information for activities in the Highland Lakes. City, state, federal, property, easement, floodplain, environmental, or utility requirements may also apply. Obtain current agency and professional determinations before excavation, sediment removal, beach creation, fill, retaining work, shoreline armoring, or disposal.
Create a water-quality response plan. The City currently publishes Highland Lakes water-quality and testing information and aquatic-plant guidance. Use those live sources for current context rather than promising that water is always safe. For suspected harmful algae, sewage, fuel, chemical release, unusual odor, fish kill, or discolored water, restrict exposure, follow current public-health and agency direction, preserve facts, notify responsible authorities, and communicate only confirmed information.
Procure dock and marina vendors with evidence. Require legal business identity, insurance appropriate to waterfront work, licenses or credentials when applicable, references, exact asset scope, engineering responsibility, permits, safety plan, dive or underwater qualifications, electrical controls, equipment and barge access, weather and water-level limits, subcontractors, pollution prevention, debris recovery, change authorization, photographs, testing, warranty, and closeout records.
Control every work order from defect to closure. Record the asset, reported condition, date, requestor, urgency, interim restriction, inspection, diagnosis, approved scope, permit question, proposal, board authority, funding, contractor, schedule, resident notice, work evidence, tests, invoice, warranty, reopening decision, and next review. Update the asset register instead of leaving the history only in a vendor invoice.
Prepare for weather, fire, collision, and water emergencies. Maintain 911 and public-agency contacts, dock address and access directions, utility shutoffs, gate access, lifesaving equipment locations, fire response, evacuation points, emergency vendors, insurer notice instructions, resident messaging, authority limits, and evidence procedures. Run tabletop scenarios for severe wind, lightning, wildfire smoke or evacuation, sinking or loose vessel, structural failure, collision, electrical hazard, fuel spill, medical emergency, and blocked access.
Budget routine care, corrective repair, and capital replacement separately. Include inspections, cleaning, electrical work, flotation, anchoring, decking, roofs, railings, gates, lighting, fire and lifesaving equipment, utilities, buoys, shoreline work, permits, professional services, emergency response, insurance, accessibility, and reserves. Connect actual condition and approved plans to reserve analysis rather than using a generic dock life assumption.
Give the board a waterfront operations dashboard. Show permit and inspection status, open safety restrictions, work orders, facility and slip occupancy, vendor performance, incidents, water-quality notices, budget and reserve variance, insurance matters, upcoming renewals, disputed responsibility, and decisions required. Keep personal, security, legal, insurance, and access-sensitive details in restricted records.
Close projects with regulatory and operational evidence. Confirm approved scope, permits, inspections, as-built changes, testing, photographs, invoices, lien or release documents when appropriate, warranties, manuals, spare materials, training, asset updates, reserve updates, owner communication, and unresolved items. A paid final invoice does not prove a permitted facility is ready to reopen.
Make the record portable. Before changing managers, board officers, dock contractors, electricians, engineers, insurers, access providers, or software, transfer surveys, plats, ownership records, permits, approved plans, inspections, asset register, slip records, contracts, maintenance history, photographs, incident files, emergency contacts, credentials, budgets, warranties, and open corrections. Test that the successor can identify every waterfront asset and its next required action.
This checklist is general association-management education, not legal, engineering, electrical, fire, navigation, environmental, shoreline, water-quality, marine, insurance, reserve, accessibility, title, survey, construction, tax, or property-specific advice. LCRA ordinances, safety standards, authorizations, permit rules, fees, City requirements, agency contacts, lake conditions, and facility facts change. Verify current official sources and use qualified Texas professionals for the actual property.