Water restrictions in Marble Falls are an active operating constraint, not a line to check once a year. The City's official Water Conservation page listed Stage 1 water restrictions effective November 19, 2026 when it was checked on November 27, 2026. Drought stages can change quickly. A board or manager should verify the live City alert before every schedule change, landscape project, pool decision, pressure-washing project, or owner notice.

Start with jurisdiction and water provider. A Marble Falls mailing address does not prove that the City supplies the water or that the property is inside city limits. The City's drought contingency plan ordinance says its provisions apply to all persons, customers, and property utilizing water provided by the City. Record the service address, meter numbers, public water system, billing account, city or county jurisdiction, irrigation source, reclaimed-water status if any, and the person authorized to speak with the utility.

Do not copy another subdivision's schedule. A neighboring community may use a different supplier, well, irrigation district, or drought plan. Texas drought contingency plans are developed for the supplier's specific sources and operations. Use the rules published by the association's actual provider and obtain written clarification when a master meter, mixed property, private system, or alternative source creates uncertainty.

Maintain a live drought-stage record. Save the official page or alert, effective date, stage, allowed days and hours, prohibited uses, exceptions, contact information, date checked, reviewer, controller changes, owner notice, vendor notice, and next verification date. Mark superseded schedules clearly instead of leaving several versions in the manager's drive or irrigation cabinet.

Classify common-area meters with the City. The current Stage 1 notice publishes separate schedules for residential odd and even addresses, commercial odd and even addresses, public schools, and hose-end irrigation. A common-area HOA meter, clubhouse, condominium parcel, pool, median, or entry monument may not fit the label a volunteer expects; the City's schedule lists large landscapes such as HOA common areas under its commercial category. Confirm the service classification and controlling address with the City rather than choosing the most convenient watering day.

Translate the live schedule into a controller matrix. List each controller, meter, zone, address, classification, allowed day, start window, estimated runtime, precipitation or soil sensor, seasonal adjustment, flow alert, responsible vendor, locked settings, and last field test. Where one controller crosses parcels or service addresses, ask the utility and irrigation professional how the schedule applies before programming it.

The City's November 19, 2026 Stage 1 notice limits irrigation with automatic or manual irrigation systems or hose-end sprinklers to once per week, for up to 15 hours, on the assigned schedule. It lists outdoor watering windows of midnight to 10:00 a.m. and 7:00 p.m. to midnight. Those details are current only until the City changes the stage or notice. Every owner communication should link to the live page and state the date verified.

Program within the allowed window without creating runoff. An available ten-hour window is not permission to irrigate continuously. Use property-specific runtimes, cycle-and-soak methods where appropriate, pressure regulation, matched precipitation, functioning check valves, seasonal adjustments, and shutoff sensors. Observe each zone for overspray onto pavement, broken heads, blocked spray, ponding, erosion, and water leaving the property.

Build a leak-response workflow. The City offers a smart-meter customer portal that can show consumption, thresholds, and leak alerts. Enroll the authorized account user, set thresholds that fit the property's baseline, route alerts to a primary and backup person, and define who can shut off irrigation, call the vendor, notify the City, and authorize emergency repair. A portal alert supplements field inspection; it does not replace it.

Separate irrigation leaks from domestic and fire-system events. Record the affected meter, isolation point, observed flow, likely system, shutoff authority, vendor, utility contact, resident impact, fire-system coordination, repair, meter reading, photographs, invoice, and closeout. Do not shut a shared domestic or fire line because an irrigation controller appears abnormal without qualified direction.

Screen every landscape project against the current stage. New sod, hydroseeding, tree establishment, plant replacement, irrigation expansion, and controller upgrades may require different scheduling, a variance, or postponement. Do not promise a contractor that a board approval creates an exemption. Obtain any public authorization from the City and preserve it with the project record.

Coordinate the City's drought rules with Texas property-owner protections. An association's landscape standards and architectural process remain subject to applicable Texas law and the governing documents. A City watering restriction does not automatically authorize permanent changes to an owner's yard, and an HOA approval does not waive the public restriction. Use current counsel for drought-resistant landscaping, owner requests, enforcement, and any conflict between old rules and current law.

Review pools, washing, and other nonessential uses separately. The City's drought contingency materials can regulate filling or refilling pools, washing vehicles, pressure washing buildings or pavement, ornamental water features, hydrant use, and other activities at particular stages. Check the live stage and adopted plan before scheduling work. Put the applicable restriction and any written authorization in the vendor work order.

Control vendors through written instructions. Landscape, pool, pressure-washing, janitorial, construction, and maintenance vendors may arrive with an old schedule. Give each vendor the service address, meter, current verified stage, allowed work window, prohibited activities, leak-reporting process, controller-access limits, and contact for questions. Require the vendor to report a field conflict before proceeding rather than assuming the contract overrides public rules.

Preserve controller custody. Limit keys, app credentials, programming codes, and remote access to named users. Require approval and a change log for schedule edits. Remove former managers and vendors promptly. After any controller replacement, power outage, firmware update, seasonal change, or service call, verify the clock, days, start times, runtimes, rain shutoff, flow settings, and manual-run behavior.

Use owner communication to reduce conflicting behavior. Provide the live City link, current stage and verification date, the association's confirmed common-area schedule, owner responsibility for private irrigation, leak reporting, contractor expectations, and the next review date. Avoid telling every owner that the common-area classification or schedule applies to the owner's separate meter.

Keep public enforcement and private enforcement distinct. The City administers its drought plan and public penalties. The association administers valid governing documents through its own notice and hearing process. If owner conduct also violates a public restriction, report or coordinate as authorized, but do not invent a City fine, threaten a utility shutoff the board cannot order, or treat an unverified complaint as a proven violation.

Use evidence before sending a private violation notice. Record the date, time, location, observed method, photographs or controller evidence, applicable association provision, current public stage, service-address classification, owner response, and cure. Check for a leak, emergency, hand-watering exception, alternative source, or public authorization. Apply comparable cases consistently.

Budget for conservation as an operating control. Track water volume, irrigation-only usage where separately metered, leak losses, repair cost, controller upgrades, sensor replacement, drought-stage landscape loss, replacement planting, vendor callouts, and expected savings. Compare month, season, and year while noting weather and restriction changes. A lower bill can reflect dead landscaping or a failed zone as easily as successful conservation.

Report useful information to the board. A concise dashboard can show current verified stage, date checked, common-area schedule, accounts enrolled for leak alerts, water use, open leaks, controller exceptions, projects awaiting clarification, owner communication, vendor compliance issues, public notices, and upcoming decisions. Keep account credentials, access codes, and owner-specific disputes out of the open packet.

Include drought operations in project and reserve planning. Irrigation mains, valves, controllers, pumps, meters, backflow devices, landscape conversions, drainage repairs, and water-saving retrofits can have multi-year costs. Connect repeated failures and water loss to the maintenance plan and reserve study rather than paying emergency invoices without a root-cause plan.

Transfer the system during every manager or board change. Deliver the meter and controller inventory, service classifications, current stage record, utility contacts, portal access, alerts, schedules, vendor instructions, controller credentials, repair history, open leaks, variances, owner templates, board decisions, budgets, and verification calendar. Test one controller and one utility account before removing the departing user's access.

This checklist is general association-management education, not legal, utility, engineering, irrigation, landscape, environmental, insurance, or property-specific advice. Drought stages, schedules, exceptions, provider boundaries, ordinances, Texas law, and property conditions change. Verify current official sources and use qualified Texas professionals for the actual community and facts.